Thursday, July 26, 2018

Non-Stop Scaffolding/ Crank-up Scaffolding

RENTING NON-STOP SCAFFOLDING


Non Stop Scaffolding for Sale or Rent. Crank-up scaffolding. Elevated-platform scaffolding
Non-Stop Scaffolding on Radius Wall

At Southwest Scaffolding, we have over 1,000 lineal feet x 35 feet high of Non-Stop scaffolding available for rent nationwide. Non-Stop Scaffolding is also called crank-up scaffolding. One working platform is assembled and climbs via a series of winches on a series of towers. This scaffolding will absolutely save you labor money on a large project and will also increase your quality since the platform level can be adjusted to exactly the right position for the workers instead of 6’4″ or greater intervals. The advantage of Non-Stop over Hydraulic Scaffolding or other type of mast climber is its price and adaptability. It is much lest expensive than a mast climber but will still reach great heights while providing an efficiency advantage over frame scaffolding. It is also more easily adaptable to odd building shapes, inside and outside corners.
Local rentals are either picked up by the customer or delivered by our trucks for an extra fee. Long-distance rentals are trucked on 40’ trailers. A typical 40′ trailer will carry approximately 275 ft. x 36 ft of Non-Stop and 250 boards. Additionally, we offer free shipping for rentals of 200 feet or more for 5 months or more. Below is a typical long-distance rental load. We recommend taking a picture of the scaffolding on the truck when it arrives on your project so you can see how it racked and loaded and be able to duplicate that when the project is complete. In addition, if you are mixing our rental Non-Stop Scaffolding with your scaffolding, please note that our scaffolding is marked with a different color on the sides.

SCAFFOLD BOARD RENTAL AND SALES 

Non-Stop requires specially cut 80.5″ 2×10 scaffolding boards. If needed, we will include these in our quote to you. These boards are available for rental or for purchase. Our 80.5″ boards are identical to our standard OSHA-tested Scaffold Boards. The only difference is length. These boards are OSHA tested, stamped and pinned on each end.

Buying Used Non-Stop Scaffolding

At Southwest Scaffolding, we sell used Non-Stop Scaffolding. From time to time, we will update our rental stock with new Non-Stop. When this happens, we usually sell our used Non-Stop. We will also buy used scaffolding directly from contractors. If you don’t want to pay the premium price for new scaffolding, call us or email us to see if we have any used scaffolding available. If you have Non-Stop or similar scaffolding that you want to sell, let us know and we’ll make you an offer to buy it.

Non-Stop Individual Parts and Accessories

From time to time, scaffolding gets lost, damaged or just wears out. If you are just looking to replace a few towers, winches, guard rails, etc., we carry both new and used individual Non-Stop parts and accessories.

Monday, July 23, 2018

OSHA Load Requirements

Scaffolding and scaffold board load requirements are governed by OSHA 1926 Subpart L. OSHA has provided a non-mandatory Appendix A to help contractors comply with the requirements of Subpart L. This appendix contains the following chart:
_______________________________________________
              |                |
  Maximum     |   Maximum      |    Maximum
 intended     | permissible    |  permissible
  nominal     |  span using    |  span using
   load       | full thickness |    nominal
 (lb/ft(2))   |   undressed    |   thickness
              |  lumber (ft)   |  lumber (ft)
______________|________________|_______________
              |                |
25............|           10   |       8
50............|            8   |       6
75............|            6   |
______________|________________|_______________
According to the Appendix, using the typical 7’ span between the frames with the 2X10 nominal thickness lumber will not achieve the 50 pounds/square foot rating in terms of board capacity. The maximum allowable span between the frames with this type of board is 6’. Here is another link to an OSHA workbook with this information: http://www.osha.gov/SLTC/etools/scaffolding/planking.html.
Does this create a problem medium-duty contractors using 7′ spans? Not necessarily. Appendix A is a guideline and not mandatory. The mandatory rule is found in OSHA 1926.451(f)(16) and says a scaffold board cannot deflect more than 1/60th of its length when loaded. This means a board on a 7′ span can deflect up to 1.4″ when fully loaded.
Some scaffolding companies, including Southwest Scaffolding, sell boards that are DI-65 #1 pine, which will deflect less that the 1/60th of the span as required by OSHA when under the stress of a medium-duty load. These boards are tested by an independent agency, and stamped. As long at the boards deflect 1.4″ or less when you are working on them, they are OSHA compliant.
OSHA’s deflection limitation makes a good case for using OSHA tested scaffolding board or manufactured boards/platforms instead of 2X10 nominal boards construction grade boards found at most lumberyards. In addition to scaffold grade lumber, Southwest Scaffolding sells both steel and aluminum 7′ and 10′ platforms that are rated for both 50 lbs/sq. ft. and 75 lbs/sq ft. Another solution to the deflection requirement is to double your planks across the spans that will be receiving materials or equipment such as cubes of brick or block. Also, consider that when you are using outriggers, the weight of your workers on the outrigger platforms will not be applied to the main platform.

Tuesday, June 19, 2018







Before You Buy Scaffolding Elsewhere


scaffoldingrentalandsales.com



Call us before you buy scaffolding from Scaffold Mart, Scaffold Express, Direct Scaffold Supply, Contractors Access Equipment, Metal Tech

Questions to ask before you buy scaffolding from our competitors

Before you buy scaffolding from competitors like Scaffold Mart, Scaffold Express, Direct Scaffold Supply, Contractors Access Equipment, or Metal Tech, consider the following questions:
  • Do they use Q-235 steel?
  • Have they load-tested their products?
  • If they have, did they test a full three-section frame or just a single frame section?
  • Do they have construction experience?
  • Do they offer training?
  • Do they deliver where you need it?

Before You Buy Scaffolding Elsewhere…

Request a quote from Southwest Scaffolding, or call us at (972) 331-1094 first and see what we can do for you!
Please follow and like us:
FACEBOOK
GOOGLE
TWITTER

Thursday, May 17, 2018

RENTING NON-STOP SCAFFOLDING



See more: scaffoldingrentalandsales.com

Non Stop Scaffolding for Sale or Rent. Crank-up scaffolding. Elevated-platform scaffolding
Non-Stop Scaffolding on Radius Wall

At Southwest Scaffolding, we have over 1,000 lineal feet x 35 feet high of Non-Stop scaffolding available for rent nationwide. Non-Stop Scaffolding is also called crank-up scaffolding. One working platform is assembled and climbs via a series of winches on a series of towers. This scaffolding will absolutely save you labor money on a large project and will also increase your quality since the platform level can be adjusted to exactly the right position for the workers instead of 6’4″ or greater intervals. The advantage of Non-Stop over FRACO or other type of mast climber is its price and adaptability. It is much lest expensive than a mast climber but will still reach great heights while providing an efficiency advantage over frame scaffolding. It is also more easily adaptable to odd building shapes, inside and outside corners.
Local rentals are either picked up by the customer or delivered by our trucks for an extra fee. Long-distance rentals are trucked on 40’ trailers. A typical 40′ trailer will carry approximately 275 ft. x 36 ft of Non-Stop and 250 boards. Additionally, we offer free shipping for rentals of 200 feet or more for 5 months or more. Below is a typical long-distance rental load. We recommend taking a picture of the scaffolding on the truck when it arrives on your project so you can see how it racked and loaded and be able to duplicate that when the project is complete. In addition, if you are mixing our rental Non-Stop Scaffolding with your scaffolding, please note that our scaffolding is marked with a different color on the sides.

Friday, May 11, 2018

Chat with us! 

Our customer service and expertise is the best in the industry. We have extensive knowledge in all facets of scaffolding and can assist you in everything from choosing the right scaffolding to OSHA compliance. We know the scaffolding business inside and out.
We understand that you have a choice when it comes to buying scaffolding. That is why we take the time, with every client, to understand what your exact needs are. Based on your input, we will help you decide what product best meets your requirements and your budget.
We work hard to provide you with the best scaffold prices available even if that means cutting our margins.
We do not sacrifice on quality. We make sure all of our products are of top-notch quality. Our scaffolding frames and accessories are high-grade steel and manufactured to our rigorous specifications. We test our products at Texas A&M to ensure they can handle far beyond even the heaviest loads put on them in the field.
We have a large yard with many items in inventory. We can usually have your order to you in a matter of days, regardless of where you are located.

At Southwest Scaffolding We:

  • Deliver across North America and beyond
  • Have years of experience with all types of scaffolding. Our sales team can help you decide what scaffolding is best for you.
  • Have competitive pricing. Our prices are among the best in the industry so you can buy knowing you didn’t pay too much.
  • Provide support if you have any issues or if you need help with your scaffolding.
  • Make sure all of our products meet or exceed the legal requirements for scaffolding (OSHA and others).

At Southwest Scaffolding We Sell:

We Rent Scaffolding Non-Stop Scaffolding.
For Spanish call 214-843-8064 and speak with Joel.
  • Will Respond In 1 Business Day
  • We are Open M – F 7:30AM – 5PM

Thursday, May 10, 2018

Scaffold Tags for Sale


Make safety a top priority and keep your scaffolding OSHA compliant with our scaffold tags.

scaffold tag, red tag insert holder
Red Tag Insert Holder
Scaffold Tag - Green
Green Tag – Front
Scaffold tag, green tag back
Green Tag – Back

Our scaffold tags consist of a holder and a green insert. The holder attaches to the scaffold frame and warns people not to use the scaffolding. Once the scaffolding is inspected by a competent person, the scaffolding is then “green tagged” by putting the green insert into the holder. The insert covers the “Do Not Use” warning and lets your workers know the scaffolding has been inspected and is ready for use.
The best practice is to have a competent person in charge of the scaffold tag for the duration of the project. The competent person inspects the scaffolding at the beginning of each shift and right after lunch and places the green insert into the tag. When the crew leaves for the day or takes a lunch break, the insert is removed and the red warning tag remains – telling people it is not safe to use the scaffolding.
These tags are a great way to reduce your liability from other trades using or working on your scaffolding after-hours and/or without your permission. It is also a great system to keep your scaffolding checked for safety hazards and to document inspections should an accident or OSHA inspection occur.
These tags are not explicitly required by OSHA for daily scaffolding use, however, many general contractors require them and we strongly recommend that you use them on your project.

Choosing the Right Frame Style and Type – Frame Scaffolding

Styles of Frame Scaffolding

We carry three different styles of frames: S-Style (Blue), W-Style (Red), and BJ-Style (Yellow). These are the industry standard styles of frame in the United States. The S-Style is interchangeable with Safeway frames, the W-Style is interchangeable with Waco frames and the BJ Style is interchangeable with Bill Jax Style frames. All if these styles have been in use for many decades so their design and functionality is tried and true. Because of this, you should be hesitant to use a scaffolding style that is not one of these styles.
One of the biggest determining factors in choosing your frame style is whether it will match your existing scaffolding. The biggest differences between the three different styles are the leg diameters (meaning they take different size pins), pin hole locations (meaning the location of the pin holes are at different angles in relation to the horizontal axis of the scaffolding frame), and styles of cross brace locks. The pins are what connect the scaffolding frames together vertically and cross braces connect the scaffolding together horizontally.



Safeway-Style Walk-Thru Frame Scaffolding for Sale
Safeway-Style Walk-Thru Frame Scaffolding for Sale

Safeway-Style Blue Scaffolding

This style our overall most popular style of frame. It fits Safeway Style Frames and is used extensively in the southern and southwestern parts of the United States. The full size frames are 6’4” tall and it takes a 1-7/16” coupling pin (USA-104 Coupling Pin), has pin holes at 45 degrees to the horizontal member, and drop locks to keep the cross braces in place. See our Safeway-Style frames for sale. 





Waco Style Ladder Frame Scaffolding for Sale
Waco Style Ladder Frame Scaffolding

Waco-Style Red Scaffolding

This style of frame scaffolding has full size frames that are 6’7” tall and takes a 1-3/8” coupling pin (USA-100 or 103 coupling pins) with pin holes at 90 degrees to the horizontal member, and candy cane style drop locks. See our Waco-Style frames for sale.



Bil Jax-Style Yellow Scaffolding

This style of frame scaffolding has full size frames that are 6’6” tall and takes a 1-3/8” coupling pin (SWS-107) with pin holes at 90 degrees, and C Locks to keep the cross braces in place. We sell Bil Jax style frames by order only. We do not keep an inventory of these on our yard.

Types of Frame Scaffolding

Walk-Thru Frames

Walk Thru Frames are often used when you need a long working platform and the ability to traverse the length of that platform by walking through the frames such as during masonry construction on a long wall. See our walk-thru style frames for sale.

Ladder Frames

Ladder frames are often used in constructing scaffolding towers, interior applications and where more precise adjustments to the working platform height is needed. Ladder frames cam also be used on the ends of a scaffolding platform in conjunction with walk-thru frames. If the rungs on the frames are less than 18” apart, the frame itself is allowed to be used as a ladder per OSHA standards. We usually recommend either a stair tower or separate bolt on ladder system be used for scaffolding access whenever possible. See our ladder frames for sale.

Half-High Frames

Our half-high frames range from 2’ to 4’ high and are often used in interior applications where additional height is needed but where ceiling heights precludes use of a full size frame. See our half-high frames for sale.

Skinny Frames

We carry frames that are 2’ to 3’ wide that are used for stucco, lighter duty applications, in tight spaces, interior applications or where the speed and ease of carrying and assembling smaller frames is a priority over size. Smaller frames also require less decking. See our skinny frames for sale.
We test our frames at Texas A & M to make sure they exceed OSHA standards and the competition. It’ll surprise you how much weight they can hold. See our COMPRESSION TEST RESULTS. 

Why you should buy Scaffolding from Southwest Scaffolding


scaffolding sales and rental
We listen to you. We understand that you have a choice when it comes to buying scaffolding. That is why we take the time, with every client, to understand what your exact needs are. Based on your input, we will help you decide what product best meets your requirements and your budget.
Amazing Prices. We work hard to provide you with the best scaffold prices available even if that means cutting our margins.
Quality Products. We do not sacrifice on quality. We make sure all of our products are of top-notch quality. Our scaffolding frames and accessories are high-grade steel and manufactured to our rigorous specifications. We test our products at Texas A&M to ensure they can handle far beyond even the heaviest loads put on them in the field.
Fast Delivery. We have a large yard with many items in inventory. We can usually have your order to you in a matter of days, regardless of where you are located.

At Southwest Scaffolding We:

  • Deliver across North America and beyond
  • Have years of experience with all types of scaffolding. Our sales team can help you decide what scaffolding is best for you.
  • Have competitive pricing. Our prices are among the best in the industry so you can buy knowing you didn’t pay too much.
  • Provide support if you have any issues or if you need help with your scaffolding.
  • Make sure all of our products meet or exceed the legal requirements for scaffolding (OSHA and others).

At Southwest Scaffolding We Sell:

We Rent Scaffolding Non-Stop Scaffolding.
Call us at 972.331.1094 or Contact us today for a consultation or quote.

Aluminum Scaffold Board with Plywood Insert

Aluminum scaffold plank with plywood insert
Aluminum/Plywood Board
Our Aluminum/Plywood Scaffold Planks function just like our solid aluminum planks except they have a plywood deck and they cost less. Like our solid aluminum boards, these boards are rated to hold 75 lbs./Sq. Ft. They come in 7′ and 10′ lengths. They weigh a little more than our solid aluminum board and are a little thicker as well.
7’X19″ SWS-1100 35.1 lbs
10″X19″ SWS-1101 51 lbs



Aluminum/Plywood Scaffold Plank Bottom
Aluminum/Ply Board – Bottom View


Aluminum/Plywood Scaffold Board - Side View
Aluminum/Ply Board – Side View

Solid Aluminum Scaffold Board

Aluminum Scaffold Board for Sale
Aluminum Scaffold Board
Our aluminum scaffold board comes in three different lengths:
5’X19″ SWS-1106 25 lbs
7’X19″ SWS-1101 30 lbs
10’X19″ SWS-1103 39 lbs
The advantage of these boards is their safety, stability, durability and load bearing capacity. They are rated for 75lbs/sq. ft and can be used in heavy-duty scaffolding applications. They are resistant to corrosion and will last you many years. These boards will also allow you to increase to a 10′ span and still have the load bearing capacity you need. The boards come with replaceable hooks and have a locking mechanism on each end of the board to keep the it attached to the scaffolding frames.
All of our boards have the same width of 19.” It takes aluminum boards to fully deck a set of scaffolding with 5′ wide frames. 42″ wide frames require 2 boards and 3′ wide frame will hold one board. Sometimes aluminum boards are used on outriggers. We have 21″ outriggers that will hold one aluminum board as well as 30″ outriggers that will hold two boards.

Aluminum Scaffold Board For Superior Strength

Aluminum boards have superior strength to wood boards and will last much longer. They make great landing platforms for materials in masonry and stucco applications and we recommend them for scaffolding towers because they stay in place much better than wood boards. The hooks on each end are offset so that these boards can be used to construct a single long scaffolding platform without the hooks overlapping each other.
Aluminum Scaffold Board reinforced bottom, aluminum deck, aluminum plank
Aluminum Board – Bottom View
Aluminum board - side view, aluminum deck, aluminum plank
Aluminum Deck – Side View



Check out other scaffold plank options at SWS:


Tube And Clamp Scaffolding



Tube and Clamp Scaffolding for sale by southwest scaffolding
Tube and Clamp Scaffolding Around Statute

Tube and clamp scaffolding

Tube and clamp scaffolding is a very adaptable scaffolding system that can be configured to access almost anything. It is most often used in industrial settings where the scaffolding needs to be configured around machinery, stacks, tanks, around stairs, etc. It is also useful around buildings with odd shapes, around cantilevers, and in applications where frame scaffolding and other types of scaffolding cannot provide adequate access.

Advantages and Disadvantages of Tube and Clamp Scaffolding

Tube and clamp scaffolding is easy to assemble and only requires a few core components such as tubes, with fittings on the ends, ranging from 4’ to 16’ in length, various types of clamps, and base plates. Tubes can lock together in a liner direction using the fittings. Vertical tubes are connected to horizontal tubes via right-angle clamps. Diagonal tubes connect to the vertical and horizontal tubes via swivel clamps to and are used to further strengthen the scaffolding platform. The horizontal tubes and vertical tubes may be adjusted to any distance apart. While the tube and clamp system may be the most versatile of all scaffolding, it is also one of the most labor intensive types of scaffolding to assemble and requires a skilled crew of scaffold builders. With other types of scaffolding, such as frame scaffolding, the right angle connections are welded together, and the diagonal sections are preassembled in the form of cross braces and are attached to the frames by snapping them to specially designed locking pins on the scaffolding frames.
Southwests scaffolding sells high-quality tube and clamp scaffolding made with Q235 galvanized steel that will support the weight you need it to support and will withstand the elements, especially in applications close to the ocean.
More information about this product, including a part list and photos can be found on Page 14 of our catalog. For very large orders, we can provide quotes on a tonnage basis instead of by the individual piece.
Please contact us if you have any questions or need a quote for tube and clamp scaffold.
Click here to see other types of scaffolding we have for sale.

Shoring Frames and Accessories for Rent or Sale

Shoring is essential for many construction projects. It supports the weight of a structure during construction or renovation. At Southwest Scaffolding, we carry heavy-duty shoring frames made of high-quality steel with thick walls. You can use our frames to tackle even the largest of construction projects. We carry frames of various heights along with accessories such as Shoring Screw Jacks, Shoring Connectors, U Heads, Base Plates and Cross Braces. Whether you need to rent or you want to purchase, contact us for all your shoring needs.
Looking to support a freestanding wall? Check out our wall braces.

Shoring Frames


Shoring Frames and accessories for Sale at Southwest Scaffolding. Nationwide supplier of scaffolding and accessories.
SWS-705 4’X6′ Shoring Frame


SWS-705 4’X6′ Frame
SWS-703 4’X5′ Frame
SWS-701 4’X4′ Frame
SWS-701 4″x3′ Frame

Specifications:

Tube Dameter: 2.375″
Wall Thickness: 0.156″
Locking System: Candy Cane
Finish: Powder Coat – Red
First lock 7″ from top of frame leg (13″ on all 6′ tall frames)

Shoring Frames: Accessories


Base Plate for Shoring Frames. At Southwest Scaffolding we have shoring and scaffolding for any size construction project with delivery nationwide.
Base Plate For Shoring



SWS-143 7″X7″ Shoring Base Plate







U-Head for Shoring Frames. Southwest scaffolding sells shoring and accessories for any size construction project. We deliver nationwide.
U-Head for Shoring




SWS-144 8″x8″ Shoring U-Head






shoring connector, coupling pin for shoring. Southwest scaffolding sells shoring and accessories for any size construction project. We deliver nationwide.
Shoring Connector




SWS-102 1-7/8″ Shoring Connector






Screw Jack for Shoring Frames
Shoring Screw Jack



SWS-133N 1-7/8″X36″ Shoring Screw Jack